5 min readCan you use the 90 °C column for THHN wire?
Yes, but only to derate from. NEC 110.14(C) caps THHN at its terminations' column, 60 °C or 75 °C; the 90 °C ampacity is where hot-room and fill derating start.
Read post -
5 min readWhy is 12 AWG wire rated 25 A but only on a 20 A breaker?
NEC Table 310.16 lists 12 AWG copper at 25 A (75 °C), but 240.4(D)(5) caps its breaker at 20 A. The higher ampacity is for derating, not a bigger breaker.
Read post -
6 min readHow do you do an electrical takeoff in metric?
Read the 1:100 or 1:50 scale off the title block, check it against the paper size, measure in metres and m², and price cable and conduit per metre.
Read post -
4 min readStart your next bid from a past one: duplicate a project
Duplicate a past project to start the next bid for the same customer: keep the scopes, vendors, rates and proposal text, and clear the dates, building size and quotes.
Read post -
4 min readHow to track bid due dates across all your projects
Keep every bid, quote, RFI and walkthrough date in one list across projects, get a morning email of what's due, and subscribe to the dates in your own calendar.
Read post -
5 min readElectrical estimate labor by cost code: hours to crew-days
Group an estimate's labor hours by cost code, divide by crew size × 8 hours to get crew-days, and export one task per code to schedule the job in MS Project.
Read post -
5 min readHow to level supplier material quotes for an electrical bid
Send every supplier the same material list, have them price it line by line, pick the best price per part, and apply those prices to this bid only, not your catalog.
Read post -
5 min readHow to connect ChatGPT to your electrical takeoff
ChatGPT Plus and Pro connect to TakeOn with no developer mode: add https://app.takeonbid.com/api/mcp as a custom MCP server, sign in, and ask about your bid.
Read post -
5 min readHow to count data drops and build a cabling BOM
Count each data outlet with its number of cables, then expand every drop into jacks, plates, rings, patch-panel ports, patch cords and cable to get the BOM.
Read post -
8 min readHow to send bid invites before your takeoff is done
Pick the scopes your takeoff calls for, send each sub and vendor an invite PDF in the first days of the bid, then level their quotes onto your Bid Summary.
Read post -
5 min readWhat happens to Bluebeam Revu 20 after Dec 31, 2026?
Revu 20 reaches end of life December 31, 2026: Studio and API access stop. Perpetual licences keep running offline; open and enterprise licences are deactivated.
Read post -
5 min readHow long can a Cat6 run be? The 295 ft limit in a takeoff
A Cat6 horizontal run is limited to 90 m (295 ft) of permanent link, 100 m (328 ft) with patch cords. Check it at takeoff, with service loop and slack included.
Read post -
6 min readProEst Desktop ends Dec 31, 2026: what are your options?
ProEst Desktop stops Dec 31, 2026, or sooner if your subscription ends. It can't be renewed and old installs won't sign in. Move to ProEst Cloud or switch.
Read post -
6 min readElectrical takeoff services: what you get and what to check
An electrical takeoff service counts and measures your drawings and sends back quantities to price, ideally with marked-up sheets so you can check every count.
Read post -
5 min readWhat is a low-voltage takeoff? Devices, cable, and steps
A low-voltage takeoff counts every data, Wi-Fi, camera, audio, access control and TV device on the drawings and measures the cable runs that feed them.
Read post -
4 min readHow to migrate from On-Screen Takeoff: what carries over
Migrating from On-Screen Takeoff to TakeOn: start a new bid, upload the plan PDFs, rebuild OST conditions as templates, then price and export. Nothing imports.
Read post -
7 min readHow to count boxes and fittings along a conduit run
In TakeOn, hold Q while drawing a conduit run and flick to a slice: the point you place also counts a box or fitting, or starts measuring an in-slab stretch.
Read post -
6 min readHow to price an electrical change order from a takeoff
Price an electrical change order by taking off added and deleted scope separately, costing both at current prices, then adding the markup your contract allows.
Read post -
6 min readWhat are assemblies in electrical estimating?
An assembly in electrical estimating is a kit: one counted item that stands for every part and the labor behind it. Count the device once and the kit is priced.
Read post -
6 min readBluebeam alternative for Mac: electrical takeoff in a browser
Bluebeam Revu is Windows software. For electrical takeoff on a Mac with no Windows VM, use a browser-based tool: TakeOn runs in Safari, Chrome, Edge or Firefox.
Read post -
6 min readAddenda and drawing revisions: update a takeoff, don't redo it
In TakeOn, upload an addendum as a new version: the Combined set shows each sheet at its newest issue, takeoff moves forward, and a Diff view colours changes.
Read post -
7 min readWhat is labor burden? Adding it to an electrical estimate
Labor burden is what an hour of labor costs the employer beyond the wage: payroll taxes, workers' comp, insurance, benefits. Add it as a percent of base labor.
Read post -
8 min readConduit homeruns on a PDF plan: measure them without tracing
To measure conduit homeruns in TakeOn, mark panels as Landmarks and pick Route to… on a run. It routes to the panel around keep-out zones and totals the length.
Read post -
6 min readHow to run an electrical bid with your own AI assistant
Connect your AI assistant to TakeOn and let it start the bid, count from schedules, price it and build the proposal, then check every change in TakeOn.
Read post -
6 min readHow to count symbols on a PDF plan automatically
To count symbols on a PDF plan automatically, box one example and let image matching find the rest. TakeOn's Find Similar proposes matches; you accept them.
Read post -
7 min readMarkup vs margin in an electrical bid: formulas and a table
Markup is profit as a percent of cost; margin is profit as a percent of the sell price. A 20% markup gives a 16.7% margin, and a 20% margin takes a 25% markup.
Read post -
5 min readHow to connect Claude to your electrical takeoff with MCP
TakeOn has an MCP connector: add it to Claude, ChatGPT or any MCP client, approve the workspaces it can read, and ask about your takeoff, bid, specs and sheets.
Read post -
6 min readPanel schedule to takeoff: turn PDF schedules into counts
To turn a panel or luminaire schedule on a PDF into a takeoff, capture the table as data, map its columns to a count template, and review the counts it creates.
Read post -
6 min readWhat is an electrical takeoff? Definition, steps, errors
An electrical takeoff is the count and measurement of every electrical item on a drawing set, producing the quantities an estimator prices to build a bid.
Read post -
5 min readFrom PDF to BOM in 15 minutes: a takeoff walkthrough
To turn a PDF electrical plan into a bill of materials in TakeOn: check the scale, define count and linear templates, click and measure, export grouped totals.
Read post -
6 min readTemplate properties: how a contractor saved 40% of estimating time
TakeOn template properties are custom fields on a takeoff item — type, voltage, circuit — with value lists and conditional fields. The takeoff groups by them.
Read post -
5 min readWhy we built a web-based takeoff tool when Bluebeam already exists
TakeOn is browser-based electrical takeoff software, built because Bluebeam, PlanSwift and On-Screen Takeoff are Windows-only and hand counts to a spreadsheet.