- low voltage
- takeoff basics
- estimating
What is a low-voltage takeoff? Devices, cable, and steps
A low-voltage takeoff counts every data, Wi-Fi, camera, audio, access control and TV device on the drawings and measures the cable runs that feed them.
The TakeOn Team 5 min read
In short: A low-voltage takeoff is the count and measurement of every communications, security and audio item on a set of construction drawings: how many data outlets, wireless access points, cameras, speakers, access-control doors and TV outlets, and how many feet of each cable type it takes to reach them. Like an electrical takeoff, it contains no prices. It is the list of quantities the estimate prices.
Key takeaways
- A low-voltage takeoff answers “how many devices and how much cable”. The estimate answers “what does it cost”.
- Most horizontal cabling is one cable per drop, run from the device back to a telecom room, so cable footage grows with the device count.
- A measured run is not the cable you buy. Add a service loop per run, multiply by the cables pulled, and add a slack percentage.
- Copper horizontal runs have a length limit, commonly cited as 90 m (295 ft). A takeoff is the cheapest place to find a run that breaks it.
- Each device implies parts that aren’t drawn: jacks, plates, rings, patch-panel ports and patch cords.
What is a low-voltage takeoff?
A low-voltage takeoff is a complete list of the low-voltage material a job requires, produced by counting devices and measuring cable runs on the drawings. “Low voltage” here means the systems that carry data, signal and control rather than power: structured cabling, Wi-Fi, video surveillance, audio, access control and television distribution. On many projects these are bid by a low-voltage or technology contractor separately from the electrical contractor, or by an electrical contractor with a low-voltage division.
The drawings usually live on technology or telecom sheets (often a “T” series), security sheets, and audio-visual sheets, with the cabling standards in the specifications. Some bid sets put low-voltage devices on the electrical plans instead.
What gets counted in a low-voltage takeoff?
A low-voltage takeoff counts every device that gets cable, grouped by system and type:
| System | Typical items counted |
|---|---|
| Data / voice | Wall, floor-box and ceiling data outlets, with the number of cables at each |
| Wireless | Wireless access points, interior and weather-resistant |
| Video surveillance | Fixed, multi-sensor, 180° and 360° cameras, monitors |
| Audio | Ceiling and wall speakers, subwoofers, volume and AV controls |
| Access control | Card-reader doors, door contacts, request-to-exit sensors, time clocks |
| Television | CATV outlets |
The count at each location matters as much as the location count. A data outlet with four cables needs four jacks, four patch-panel ports and four patch cords, and four runs of cable back to the telecom room.
How do you measure cable in a low-voltage takeoff?
You measure a low-voltage cable run by tracing its path on a scaled sheet from the device to the telecom room, then adjusting the traced length for what the plan doesn’t show. A plan is a top-down view, so the vertical drop from the ceiling to a wall outlet isn’t in the traced length.
The cable you order for a group of runs is usually worked out as:
- Sum the traced lengths.
- Add a service loop for each run: extra cable left coiled so the run can be re-terminated or moved later. Practice and specs vary on how much.
- Multiply by the cables per run when several cables share a path to the same outlet.
- Add a slack percentage for waste, routing around obstructions and terminations.
Take a worked example: two runs of 100 ft each, two cables per run, a 15 ft service loop and 10% slack. That is (200 + 2 × 15) × 2 × 1.1 = 506 ft of cable.
Pathway matters too: J-hooks, cable tray, conduit and open plenum each carry their own material and labor, so record the pathway with the run.
What are the common mistakes in a low-voltage takeoff?
The common mistakes in a low-voltage takeoff are counting locations instead of cables, forgetting service loops and slack, missing over-length runs, and leaving out the head-end parts each drop implies.
- Locations instead of cables. A “4” next to a data outlet symbol means four drops. Counting it as one under-buys cable and terminations fourfold.
- No service loop or slack. The traced length is the shortest cable that could work. Real cable runs are longer.
- Runs over the length limit. A run that exceeds the horizontal cabling limit needs another telecom room, a different route, or fiber. Finding that after award is expensive.
- Head-end parts left out. Patch-panel ports and patch cords sit in the telecom room, not on the floor plan, so they are easy to forget.
How does TakeOn handle a low-voltage takeoff?
TakeOn is web-based takeoff and estimating software for electrical and low-voltage contractors. TakeOn runs in a browser on macOS, Windows and Linux, with nothing to install.
When a team signs up, TakeOn asks “What does your team estimate?” with three
answers: Electrical, Low voltage or Both. A Low voltage or Both workspace
starts with seven templates, all prefixed LV - so they never collide with
electrical ones:
| Template | Kind | What it records |
|---|---|---|
| LV - Data Outlet | count | Outlet type (wall, floor box, ceiling box, telephone) and cables |
| LV - Wireless AP | count | Interior or weather resistant |
| LV - CCTV Camera | count | Fixed, bidirectional, 180 view, 360 view, monitor |
| LV - Speaker / Audio | count | Speaker, subwoofer or control type, and zone |
| LV - Access Control | count | Card reader door or time clock |
| LV - CATV Outlet | count | — |
| LV - Cable Run | linear | Cable type, pathway, cables, service loop, slack % |
Each count template is linked to a kit of parts, so a counted data outlet
with two cables becomes two jacks, a faceplate, a ring, two patch-panel ports
and two patch cords in the estimate. The LV - Cable Run template applies the
service loop, cables and slack calculation above to every run you trace, and
flags any run longer than 295 ft on the drawing.
The parts in those kits ship without prices. You price them from your own catalog or supplier list, so the numbers in the bid are yours. A workspace created as Electrical can add the same content later: a workspace owner opens Settings → Workspace → Configuration and uses Add starter pack → Low voltage.
The rest of TakeOn works the same for either trade: scale set per sheet, template properties that split counts into groups, totals that update as you draw, and assemblies that turn each count into priced parts. See the full list on the features page.
Try TakeOn free and pick Low voltage when it asks what your team estimates.
Frequently asked questions
- What is included in a low-voltage takeoff?
- A low-voltage takeoff counts data outlets, wireless access points, security cameras, speakers and audio controls, access-control doors and TV outlets, and measures the horizontal cable runs between those devices and the telecom room. It also covers the parts each device implies, such as jacks, faceplates, patch-panel ports and patch cords.
- How is a low-voltage takeoff different from an electrical takeoff?
- An electrical takeoff measures power: conduit, wire, panels, fixtures and receptacles. A low-voltage takeoff measures communications and control cabling, where each device is usually a home run of its own cable to a telecom room and a single cable run has a maximum length, commonly 90 m (295 ft) for copper horizontal cabling.
- What is a service loop in cabling?
- A service loop is extra cable left coiled at the end of a run, usually in the telecom room and sometimes at the outlet, so the cable can be re-terminated or moved later without pulling a new one. Estimators add it to each run's measured length, along with a slack percentage for waste and routing.
- Does TakeOn support low-voltage contractors?
- Yes. When a team signs up for TakeOn it picks Electrical, Low voltage or Both, and a Low voltage workspace starts with templates for data outlets, wireless APs, CCTV cameras, speakers, access control, CATV outlets and cable runs, linked to kits of parts the contractor prices.
- Can I do a low-voltage takeoff on a Mac?
- Yes, with browser-based takeoff software. TakeOn runs in a browser on macOS, Windows and Linux with nothing to install.