• takeoff basics
  • electrical takeoff
  • estimating

Electrical takeoff services: what you get and what to check

An electrical takeoff service counts and measures your drawings and sends back quantities to price, ideally with marked-up sheets so you can check every count.

The TakeOn Team Updated 6 min read

A fragment of an electrical floor plan with count markers on devices and a measured conduit run

In short: An electrical takeoff service does your takeoff for you. You send the drawing set, and the service counts the devices and fixtures, measures the conduit and cable runs, and sends back the quantities for you to price. A good one also sends the marked-up sheets, so you can check every count. Before you trust an outsourced takeoff, check the scale, the scope and the markups. The bid is still yours.

Key takeaways

  • An electrical takeoff service produces quantities, not a price. Pricing, labor and markup usually stay with you.
  • Ask for marked-up sheets as well as the spreadsheet. A total you can’t trace back to a mark on the drawing can’t be checked.
  • Turnaround and price depend on the sheet count, the scope and how soon you need it. Agree on all three in writing before work starts.
  • Outsourcing makes sense for overflow and bid-week crunches. Doing the takeoff in-house keeps the knowledge of the job with your estimator.

What is an electrical takeoff service?

An electrical takeoff service is a company or freelancer that does the electrical takeoff for a contractor: the count and measurement of every electrical item on a drawing set. You send the plans and tell the service what scope to cover, and it returns the quantities your estimator would otherwise produce.

Electrical takeoff services are used by contractors who bid more work than their estimators can take off, by shops without a full-time estimator, and by anyone facing three bids due in the same week.

What do you get back from an electrical takeoff service?

You get back a list of quantities from an electrical takeoff service: how many of each device and fixture, and how many feet of each conduit, wire and cable run. What else comes with it varies by provider, so ask for it explicitly:

DeliverableWhy it matters
Quantities by item typeThe minimum. Fixture types should match the luminaire schedule’s tags.
A breakdown by floor, area or circuitLets you price phases, alternates and change orders without recounting.
Marked-up sheetsEvery count and run drawn on the plan, so you can audit the work.
An Excel or CSV exportSo the numbers go into your estimate without retyping.
A list of assumptions and exclusionsWhat was skipped, what was assumed, which addenda were included.

The marked-up sheets are the deliverable most worth insisting on. A spreadsheet of totals with no marks behind it asks you to take the count on faith.

How long does an outsourced electrical takeoff take?

How long an outsourced electrical takeoff takes depends on the service, the size of the plan set and the scope, so ask for a committed delivery date before you send plans. The things that move the turnaround:

  • Sheet count and density. A tenant improvement with a few lighting and power sheets goes faster than a multi-floor building.
  • Scope. Lighting and devices only is quicker than lighting, power, fire alarm, low voltage and feeders together.
  • Schedules and specs. Counting fixtures against a luminaire schedule, or reading a feeder schedule, adds time.
  • Rush. Some services charge more to move your job up the queue.

Get the delivery date in writing, and leave yourself time to check the quantities and price them before the bid is due.

Doing the takeoff yourself instead? The same drivers set how long an electrical takeoff takes in-house.

How are electrical takeoff services priced?

Electrical takeoff services are usually priced per sheet, per project, by the hour, or by a quote based on the scope. Published rates vary widely between providers, so get a written quote for your plan set rather than relying on a rate card.

What moves the price is the same list that moves the turnaround: how many sheets, how much scope, how dense the drawings are, and how fast you need it. Ask whether revisions after an addendum are included or charged separately. An addendum that reissues half the set can cost almost as much as the original takeoff.

What should you check before trusting an outsourced takeoff?

Check the outsourced takeoff the way you would check a new estimator’s work: on the drawings, not just in the totals.

  1. Scale on every sheet. Pick one known dimension per sheet and measure it. A wrong scale makes every run on that sheet wrong by the same factor.
  2. Scope and exclusions. Confirm what was counted and what was left out, and that every addendum was included.
  3. The markups. Look for unmarked symbols on each sheet, and for devices counted twice on an overall plan and an enlarged plan.
  4. Who did the counting. Ask who counted, whether any software or AI was used, and whether a person reviewed every count before it was sent.
  5. What happens to your plans. Ask who sees them, whether they are used for anything else, and how to have them deleted.
  6. Spot-check against your own count. Take off one sheet yourself and compare. If that sheet matches, the rest is more likely to.

However the takeoff was produced, the bid is yours. The quantities you price are the ones you stand behind.

Should you outsource your electrical takeoff or do it in-house?

Outsource the electrical takeoff when the volume of bids is more than your estimators can handle; keep it in-house when the takeoff is how your estimator learns the job. Many shops do both: in-house by default, outsourced for overflow.

Outsourced takeoffIn-house takeoff
Bid volumeAbsorbs peaks without hiringLimited by your estimators’ hours
Bid-week crunchFrees your estimator to price and reviewEverything waits on one person
ControlYou check someone else’s workYou know exactly how it was done
Knowledge of the jobStays with the serviceStays with your estimator, for the bid and the build
Cost per bidA fee every timeEstimator time plus a software subscription
Learning curveExplaining your scope and breakdownLearning the takeoff software

How does TakeOn’s free takeoff work?

TakeOn will do one electrical takeoff for you free, one set per company, within 24 hours. Upload a plan set or paste a link (Dropbox, Google Drive or a bid portal) on the free takeoff page, tick the scope you want counted, and leave your email.

The TakeOn team runs the takeoff in TakeOn, with Claude doing the first pass over the sheets and schedules, and a person checks every count and run before it goes back to you. You get:

  • every count and run marked on the sheets, so you can check the work at a glance;
  • an Excel export of the quantities, broken down the way you asked;
  • a link to the live project in TakeOn, if you want to keep going from there.

It covers quantities only. Pricing, labor and the number you submit stay yours. Your plans are used only for your takeoff, never to train AI models, and are deleted whenever you ask.

Send us a plan set for a free takeoff and check the result against a job you’ve already bid.

Frequently asked questions

What is an electrical takeoff service?
An electrical takeoff service is a company or freelancer that does the takeoff for an electrical contractor. You send the drawing set, and they count the devices and fixtures, measure the runs, and send back the quantities for you to price.
Does an electrical takeoff service price the bid?
Usually not. Most electrical takeoff services return quantities only, and the contractor applies material prices, labor units and markup. Some services also offer full estimating, so ask what is included before you send plans.
How much does a takeoff cost?
It depends on the plan set. Takeoff services price per sheet, per project, by the hour or by a quote, and published rates vary widely, so get a written quote for your drawings. What moves the price is how many sheets there are, how much scope you want taken off, how dense the drawings are and how fast you need it back. Ask whether a revised takeoff after an addendum is included or charged separately.
Should an outsourced takeoff come with marked-up drawings?
Yes. Marked-up drawings show exactly what was counted and measured on each sheet, so you can spot a missed area or a wrong scale in minutes. A bare spreadsheet of totals gives you no way to check the work.
Is it safe to send construction plans to a takeoff service?
Ask before you send them. A takeoff service should say who sees your plans, whether they are used for anything other than your takeoff, such as training AI models, and how to have them deleted. Bid documents can carry confidentiality terms of their own, so check those too.
Does TakeOn offer a free electrical takeoff?
Yes. TakeOn will do one electrical takeoff free per company: upload a plan set at takeonbid.com/free-takeoff/ and get marked-up sheets, an Excel export and a link to the live project back within 24 hours. You get quantities for your review, and you own the bid.