How to track bid due dates across all your projects
Keep every bid, quote, RFI and walkthrough date in one list across projects, get a morning email of what's due, and subscribe to the dates in your own calendar.
The TakeOn Team 4 min read
In short: To track bid due dates across all your projects, keep every bid’s dates on the project itself (bid due, quote deadline, RFI cutoff, walkthrough), then read them from one list sorted by date, not from a spreadsheet you update by hand. In TakeOn, the Bids page lists those dates across the workspace, a daily email lists what’s due in the next 3 days, and a private calendar link puts them in Google Calendar or Outlook.
Key takeaways
- A bid has more than one deadline. The quote deadline comes first and is the one that leaves a scope uncovered if it’s missed.
- Enter each date once, where the bid lives, so the list, the reminder and the calendar can’t disagree.
- Flag deadlines with scopes nobody has priced yet. That’s the warning that matters, not the date alone.
- In TakeOn, the Bids page, the daily email and the calendar feed all read the same dates.
Which dates does a bid actually have?
A bid usually has four dates worth tracking:
| Date | What it is | Why it matters |
|---|---|---|
| Walkthrough | The pre-bid site visit | Often mandatory to bid |
| RFI cutoff | Last day to ask the design team questions | Late questions don’t get answered |
| Quote deadline | When subs and suppliers must have prices to you | Usually a day or two before the bid, so there’s time to level them |
| Bid due | The date and time the bid must be received | Late bids are usually rejected |
An estimator carrying six bids has two dozen dates. They live on bid invites, in emails and in a specification section, and none of them reminds anyone.
Why does a spreadsheet of bid dates break?
A spreadsheet of bid dates breaks because it is a second copy. The date on the project changes with an addendum, the spreadsheet doesn’t, and nobody notices until the wrong day. It also can’t tell you the thing you most need to know: which quote deadlines still have scopes nobody has said they’ll price.
The fix is to store each date once, on the project, and have every view read from there.
How does TakeOn track bid dates across projects?
TakeOn tracks bid dates across projects on the Bids page (menu → Bidding → Bids), which doesn’t need a project open. It lists bid, quote, RFI and walkthrough dates for the workspace’s projects, grouped under Past due, This week, Next week and each later week. Each row links to its project.
Where the dates come from in TakeOn:
- Bid due is the project’s bid due date, with an optional time. Set it when you create the project, in Project settings, or on the Pre-bid page.
- Quote, RFI and walkthrough dates are set on the project’s Pre-bid page. A quote deadline can also be worked out from the bid time and your workspace’s lead time.
- A scope with its own quote deadline gets its own row when it differs from the project’s.
TakeOn flags deadlines that still have open scopes, meaning scopes going out for pricing that no invited vendor has said they’re bidding or quoted. The count shows as a badge: amber while the deadline is ahead, red once it has passed. A past date drops off the list unless it still has open scopes.
The filters are a checkbox per pipeline stage (and No stage), and Only mine for projects where you’re the estimator or the Pre-bid bid contact. Archived projects never appear.
Can TakeOn remind you of bid deadlines by email?
Yes. TakeOn sends a daily bid calendar email each morning with the bid, quote, RFI and walkthrough dates due today and in the next 3 days, plus any recent deadline that is past due and still has open scopes. It is sent only on days when something is due.
The digest goes to every member of the workspace and covers the whole workspace’s bids, because small shops tend to want the whole board. Each person can turn it off from the email or in Settings → Notifications. The email goes out at 12:00 UTC, which is early morning in US time zones.
How do you put bid dates in Google Calendar or Outlook?
You put TakeOn bid dates in Google Calendar or Outlook by subscribing to your calendar feed. In Settings → Notifications, click Create calendar link, copy the link, and add it in your calendar app as a calendar from a URL.
How the TakeOn calendar feed behaves:
- A date without a time shows as an all-day event; a date with a time shows at that time, as written on the project.
- Events update in place when a date changes in TakeOn, on your calendar app’s next refresh.
- The link is shown once, so copy it then. Anyone with it can see the dates, so keep it to yourself. Make a new link replaces it and the old one stops working; Turn off removes it.
- It is one way. Moving an event in your calendar doesn’t change the bid.
For the scopes and invites those quote deadlines belong to, see how to send bid invites before your takeoff is done. Getting the quote deadline right is the first step of pricing material; see how to level supplier material quotes for what to do with the prices once they arrive. When the documents change before bid day, see handling addenda and drawing revisions. The estimating features in TakeOn page covers the rest. Try TakeOn free.
Frequently asked questions
- Which dates should an electrical estimator track for each bid?
- At least four: the bid due date and time, the deadline for sub and supplier quotes (usually a day or two before the bid), the RFI cutoff, and any pre-bid walkthrough. Missing the quote deadline is the costly one, because a scope goes to bid unpriced.
- Can TakeOn show bid due dates from every project in one place?
- Yes. TakeOn's Bids page (menu → Bidding → Bids) lists bid, quote, RFI and walkthrough dates across your workspace's projects, grouped Past due, This week, Next week and by later week, with filters by pipeline stage and Only mine.
- Does TakeOn send bid deadline reminders?
- Yes. TakeOn sends a daily bid calendar email listing the bid, quote, RFI and walkthrough dates due today and in the next 3 days, and only on days when something is due. Each person can turn it off in Settings → Notifications or from the email.
- Can I see TakeOn bid dates in Google Calendar or Outlook?
- Yes. In TakeOn's Settings → Notifications, Create calendar link gives you a private calendar feed URL to subscribe to in Google Calendar or Outlook. Make a new link replaces it, and the old link stops working.
- Does the TakeOn bid calendar sync changes back from my calendar?
- No. TakeOn's calendar feed is one way: dates are set in TakeOn, on the project or its Pre-bid page, and your calendar app shows them. Moving an event in your calendar doesn't change the bid.