Fire alarm battery calculator
A fire alarm battery needs the total standby current × the standby hours, plus the total alarm current × the alarm minutes ÷ 60, with a safety margin on top, in amp-hours. Round that up to the next battery size.
Enter your devices' currents from their data sheets below for the amp-hours and the battery size, with the working shown. It runs in your browser; nothing you type is saved or sent. Copy link shares your rows.
A sizing aid for estimating, not a code compliance tool. It doesn't replace the panel manufacturer's battery calculation, the engineer of record or the AHJ. Device currents come from the manufacturers' data sheets; this page supplies none, and its example currents are made up.
How do you calculate a fire alarm battery?
Total the currents, turn them into amp-hours over the standby and alarm times, and add the margin:
standby Ah = Σ (qty × standby current) × standby hours alarm Ah = Σ (qty × alarm current) × alarm minutes ÷ 60 required Ah = (standby Ah + alarm Ah) × (1 + margin %)
This is the calculator's example, not a benchmark. Its currents are made up. Its 4 device types draw 0.1608 A in standby and 2.068 A in alarm. 0.1608 A × 24 h is 3.86 Ah, and 2.068 A × 5 min ÷ 60 is 0.17 Ah. With a 20% margin that's 4.84 Ah, so a 7 Ah battery.
In the example, standby is most of the answer: a small current for a whole day can outweigh a large one for minutes. So the panel's own standby draw and every small device's current count, not only the notification appliances.
What standby and alarm times does NFPA 72 require?
In the general case, the secondary supply has to run the system for 24 hours in standby and then 5 minutes in alarm (NFPA 72 (2022 edition), 10.6.7.2.1). An emergency voice/alarm communication system needs 15 minutes in alarm, under the same section. Those are the calculator's example durations, and you can change them.
Check the edition your AHJ enforces, any local amendments and the project specification. Some systems and jurisdictions call for longer, and the margin to add is set by the panel manufacturer's calculation and the edition in force.
Which battery size do you pick?
The next size up from the required amp-hours. The calculator rounds up on an example list of common sealed lead-acid ratings: 7, 12, 18, 26, 33, 40, 55, 75, 100 Ah. Makers' sizes differ, and a panel's charger only supports batteries up to a limit, so check its installation manual. Past 100 Ah, the usual answer is an external charger and battery cabinet, sized with the maker's guidance.
Every device you count on the drawings is a row here. On a fire alarm bid, the low-voltage takeoff is where those counts come from.
Related tools
- Low-voltage cable footage calculator: Turn device counts into cable footage and 1,000 ft boxes: cables per device, average run and service loop per device type, plus waste, with a 295 ft check.
- Sleeve fill calculator: How many cables fit in a sleeve through a wall: the fill % against your firestop listing's max fill, the NEC 60% nipple and Table 1 figures for reference, and how many more cables fit.
- Wire ampacity calculator: Get a conductor's allowable ampacity from NEC Table 310.16, derated for ambient and conductor count and capped at the 75 °C or 60 °C termination rating.
- Wire size calculator: Find the smallest wire for a load from NEC Table 310.16, with the 125% continuous-load factor, 240.4(D) breaker limits and an optional voltage-drop limit.
- Voltage drop calculator: Get a run's voltage drop in volts and percent from the NEC Chapter 9 Table 8 resistance, single- or three-phase, or the longest run that stays within a target drop.
- Metric voltage drop calculator: Voltage drop in metres: type the cable's mV/A/m from its datasheet, the current, the length and the voltage for the drop in volts and percent, and a pass or fail against your own limit.
- Ground wire size calculator: Size the equipment grounding conductor from NEC Table 250.122, and upsize it in proportion when the phase conductors were upsized for voltage drop (250.122(B)).
- Neutral conductor size calculator: Size a feeder or service neutral from the NEC 220.61 unbalanced load, with the 70% reduction over 200 A, and the Table 250.122 or 250.102(C)(1) minimum.
- Motor circuit calculator: wire, breaker and ground size: Size a single motor's branch circuit from NEC Article 430: full-load current, the conductor at 125%, the largest breaker or fuse, the ground wire and the overload.
- Transformer amps calculator: Get a transformer's primary and secondary full-load amps from its kVA, phase and voltages, with a table for the standard kVA ratings.
- Ohm's law calculator: Enter any two of voltage, current, resistance and power to get the other two, with the formula used, for DC and resistive circuits.
- Conduit support spacing calculator: Get the NEC maximum distance between conduit supports and from a box for EMT, IMC, RMC, PVC, RTRC, ENT, FMC, LFMC and LFNC, and the minimum strap count for a run.
- Conduit fill and size calculator: What size conduit do you need? Mix wire types and sizes, grounds included, and get the smallest conduit that fits plus the fill % in every trade size, from NEC Chapter 9.
- Metric conduit fill calculator: Conduit fill in millimetres: type the conduit's internal diameter and each cable's overall diameter for the fill %, a pass or fail against your own limit and the largest cable that still fits.
- All free tools for electrical estimators
- Low-voltage takeoff in TakeOn: counts, cable runs and kits on the PDF plans
- What goes into one: what is a low-voltage takeoff
- Cable runs on the same bid: the 295 ft Cat6 limit in a takeoff
-
How do you calculate fire alarm battery size?
Add up the standby current of every device and panel the battery feeds and multiply by the standby hours. Add the total alarm current multiplied by the alarm minutes divided by 60. Add your safety margin to that total, then pick the next battery size up. The result is the battery's amp-hour rating.
-
How long must a fire alarm battery last?
In the general case, NFPA 72 (2022 edition), 10.6.7.2.1 calls for 24 hours of standby followed by 5 minutes in alarm, and 15 minutes in alarm for an emergency voice/alarm communication system. Your AHJ, the edition it enforces and the project specification can call for more, so check them before you size the battery.
-
What safety margin should I add to a fire alarm battery calculation?
The margin covers battery capacity lost to age and temperature. Use the one your panel manufacturer's battery calculation and the NFPA 72 edition your AHJ enforces call for. The calculator's 20% is an example you can change.
-
Where do the device currents come from?
From each device's manufacturer data sheet, which lists its standby (supervisory) and alarm current. The calculator doesn't supply any: its example currents are made up so you can see the math work.
-
Should I enter currents in mA or amps?
Whichever your data sheets use. Detectors and modules are usually listed in milliamps and panels and notification appliances in either. The toggle switches both columns at once and converts the values already typed, so the answer doesn't change.
-
Does this replace the panel manufacturer's battery calculation?
No. It's a sizing aid for estimating. The panel manufacturer's battery calculation, the engineer of record and the AHJ have the final say on the battery a system needs.
-
Does this calculator save or send what I type?
No. The calculator runs entirely in your browser. Nothing you enter is saved or sent anywhere, and no account is needed. Copy link puts your rows in the link itself, so only the people you send it to see them.
Counted, not guessed
Count every device on the plans.
In TakeOn, count detectors, strobes and pull stations on the PDF drawings with count templates, and every count lands in your takeoff. No credit card needed.