Conduit support spacing calculator

EMT, IMC and rigid conduit need a support at most every 10 ft and within 3 ft of every box or termination. PVC goes by trade size (3 ft to 8 ft), ENT is every 3 ft, and flexible metal conduit every 4½ ft and within 12 in of a box.

Pick the raceway for its NEC 2023 rule and section, then enter a run's length and boxes to count the straps it needs at the code minimum. It runs in your browser; nothing you type is saved or sent.

Example values, not benchmarks. Replace them with your own.

Raceway
Count straps for a run (optional)

Boxes or conduit bodies between the two ends, not couplings or elbows; the ends always count.

Max between supports
10 ft
358.30(A)
Max from a box or termination
3 ft
358.30(A)

Conditions and exceptions

  • Exception No. 1: unbroken lengths may be fastened up to 5 ft from a termination where structural members don't readily permit 3 ft.
  • Exception No. 2: in concealed work in finished buildings or prefinished wall panels where securing is impracticable, unbroken lengths (without a coupling) may be fished.
  • Horizontal runs through openings in framing members no more than 10 ft apart count as supported, if fastened within 3 ft of terminations (358.30(B)).
Minimum straps, boxes evenly spaced
12 straps

The count, with your numbers

EMT: supports ≤ 10 ft apart (358.30(A)),
     ≤ 3 ft from each box (358.30(A))

run 100 ft, 1 box along it → 2 segments of 50 ft
(boxes assumed evenly spaced)
per segment: 1 + ⌈(50 − 2 × 3) ÷ 10⌉ = 1 + 5 = 6 straps
total: 2 × 6 = 12 straps

This is the code minimum with the boxes evenly spaced: a support at the end distance from each box and as few between as keep every span within the spacing. Boxes set unevenly can need more. Many specs and installers add more.

Quick answers: max distance between straps and from a box

The two distances every raceway article's .30 section sets, from NFPA 70, 2023 edition: the most one support may be from the next, and the most the first strap may be from a box, conduit body or termination. The exceptions are listed with each type in the calculator. To turn these into a count for a run, see how many conduit straps a run needs.

NEC 2023 maximum distance between supports and from a box to the first strap, by raceway type
Raceway Between supports Box to first strap
EMT Electrical metallic tubing 10 ft 358.30(A) 3 ft 358.30(A)
IMC Intermediate metal conduit 10 ft; 10–20 ft by size on straight threaded runs 342.30(B)(1); Table 344.30(B)(2) 3 ft 342.30(A)
RMC Rigid metal conduit 10 ft; 10–20 ft by size on straight threaded runs 344.30(B)(1); Table 344.30(B)(2) 3 ft 344.30(A)
PVC Rigid polyvinyl chloride conduit 3–8 ft by size Table 352.30 3 ft 352.30(A)
RTRC Reinforced thermosetting resin conduit 3–8 ft by size Table 355.30 3 ft 355.30(A)
ENT Electrical nonmetallic tubing 3 ft 362.30(A) 3 ft 362.30(A)
FMC Flexible metal conduit 4½ ft 348.30(A) 12 in 348.30(A)
LFMC Liquidtight flexible metal conduit 4½ ft 350.30(A) 12 in 350.30(A)
LFNC Liquidtight flexible nonmetallic conduit 3 ft 356.30 12 in 356.30

Support spacing by trade size

PVC and RTRC always go by trade size. RMC and IMC may, but only on a straight run made up with threaded couplings where the supports keep stress off the terminations; otherwise it's 10 ft.

Table 344.30(B)(2): Rigid metal conduit (RMC) and IMC, straight runs with threaded couplings
Trade size Max between supports
½–¾ 10 ft
1 12 ft
1¼–1½ 14 ft
2–2½ 16 ft
3 and larger 20 ft
Table 352.30: Rigid PVC conduit
Trade size Max between supports
½–1 3 ft
1¼–2 5 ft
2½–3 6 ft
3½–5 7 ft
6 8 ft
Table 355.30: Reinforced thermosetting resin conduit (RTRC)
Trade size Max between supports
½–1 3 ft
1¼–2 5 ft
2½–3 6 ft
3½–5 7 ft
6 8 ft

How many straps does a conduit run need?

Every raceway article's .30 section sets two distances: the most the first support may be from a box, conduit body or termination (e), and the most one support may be from the next (s). The fewest straps that meet both put one at e from each end and as few between as keep every span within s. A segment no longer than 2e takes a single strap.

straps per segment = 1 + ⌈(L − 2e) ÷ s⌉     (L > 2e)
                   = 1                     (L ≤ 2e)

A box along the run ends the raceway on both sides, so each box-to-box segment gets its own end straps. The calculator splits the run at the boxes, assumes they're evenly spaced, and adds up the segments. Boxes set unevenly can need more (100 ft of EMT with boxes at 20 and 40 ft takes 13, not 12), so count each segment on its own when they are. Couplings and elbows aren't boxes: they don't split the run.

An example, not a recommendation: 100 ft of EMT with one box along it is two 50 ft segments at 10 ft and 3 ft, so 6 straps each and 12 straps in all. The same run with no box takes 11 straps. This is the code minimum; many specs and installers add more.

A sizing aid, not the code. This calculator gives the general support rules from the raceway articles' .30 sections of NFPA 70, 2023 edition, including Tables 344.30(B)(2), 352.30 and 355.30, and lists their exceptions without modelling them. It doesn't cover cable supports, seismic bracing, hanger load ratings or expansion fittings, and it is not a substitute for the code, the engineer of record or the authority having jurisdiction. Local amendments, the project specification and conditions the calculator doesn't model can change the answer.

Related tools

  • Conduit fill and size calculator: What size conduit do you need? Mix wire types and sizes, grounds included, and get the smallest conduit that fits plus the fill % in every trade size, from NEC Chapter 9.
  • Metric conduit fill calculator: Conduit fill in millimetres: type the conduit's internal diameter and each cable's overall diameter for the fill %, a pass or fail against your own limit and the largest cable that still fits.
  • Wire ampacity calculator: Get a conductor's allowable ampacity from NEC Table 310.16, derated for ambient and conductor count and capped at the 75 °C or 60 °C termination rating.
  • Wire size calculator: Find the smallest wire for a load from NEC Table 310.16, with the 125% continuous-load factor, 240.4(D) breaker limits and an optional voltage-drop limit.
  • Voltage drop calculator: Get a run's voltage drop in volts and percent from the NEC Chapter 9 Table 8 resistance, single- or three-phase, or the longest run that stays within a target drop.
  • Metric voltage drop calculator: Voltage drop in metres: type the cable's mV/A/m from its datasheet, the current, the length and the voltage for the drop in volts and percent, and a pass or fail against your own limit.
  • Ground wire size calculator: Size the equipment grounding conductor from NEC Table 250.122, and upsize it in proportion when the phase conductors were upsized for voltage drop (250.122(B)).
  • Neutral conductor size calculator: Size a feeder or service neutral from the NEC 220.61 unbalanced load, with the 70% reduction over 200 A, and the Table 250.122 or 250.102(C)(1) minimum.
  • Motor circuit calculator: wire, breaker and ground size: Size a single motor's branch circuit from NEC Article 430: full-load current, the conductor at 125%, the largest breaker or fuse, the ground wire and the overload.
  • Transformer amps calculator: Get a transformer's primary and secondary full-load amps from its kVA, phase and voltages, with a table for the standard kVA ratings.
  • Ohm's law calculator: Enter any two of voltage, current, resistance and power to get the other two, with the formula used, for DC and resistive circuits.
  • Fire alarm battery calculator: Size a fire alarm panel's standby battery in amp-hours from your devices' standby and alarm currents, the NFPA 72 standby and alarm times and a safety margin.
  • Low-voltage cable footage calculator: Turn device counts into cable footage and 1,000 ft boxes: cables per device, average run and service loop per device type, plus waste, with a 295 ft check.
  • Sleeve fill calculator: How many cables fit in a sleeve through a wall: the fill % against your firestop listing's max fill, the NEC 60% nipple and Table 1 figures for reference, and how many more cables fit.
  • All free tools for electrical estimators
  • Counting boxes and fittings as you draw a run: the Quick Wheel
  • Why boxes change the count, with worked examples: how many conduit straps a run needs

Questions

Frequently asked

Can't find an answer? Email contact@takeonbid.com — we read every one.

  • What is the maximum distance between supports for 1¼″ LFNC?

    3 ft. Liquidtight flexible nonmetallic conduit must be secured at intervals of no more than 3 ft, and within 12 in on each side of every box, cabinet, conduit body or fitting (NEC 2023 356.30). The spacing doesn't change with trade size, so 1¼″ is 3 ft like every other size.

  • What is the maximum distance between straps for 2½″ PVC?

    6 ft, from Table 352.30 for trade sizes 2½–3. The first strap must also be within 3 ft of each box or termination (352.30(A)). Conduit listed for other spacings may be installed to its listing.

  • How many straps does a 27 ft straight run of 2½″ PVC need?

    5 straps at the code minimum, for a box-to-box run with no boxes along it: one within 3 ft of each end (352.30(A)) and enough between that no span exceeds 6 ft (Table 352.30). Each box along the run adds its own end straps.

  • What is the maximum distance between a box and the first strap for 1″ EMT?

    3 ft (NEC 2023 358.30(A)), for every trade size of EMT. Where structural members don't readily permit fastening within 3 ft, an unbroken length may be fastened up to 5 ft from the termination. After the first strap, supports go no more than 10 ft apart.

  • Where ¾″ RMC is installed, what is the maximum distance from a box to the first strap?

    3 ft from each box, conduit body or other termination (NEC 2023 344.30(A)). Where structural members don't readily permit fastening within 3 ft, it may be up to 5 ft. IMC has the same rule (342.30(A)).

  • How far apart are rigid conduit supports?

    10 ft for RMC and IMC, with the first support within 3 ft of each termination (RMC 344.30(B)(1), 344.30(A); IMC 342.30(B)(1), 342.30(A)). A straight run made up with threaded couplings may use Table 344.30(B)(2) instead: 10 ft for trade sizes ½–¾, rising to 20 ft for 3 and larger.

  • What is the maximum support spacing for 1¼″ rigid conduit?

    14 ft on a straight run made up with threaded couplings (Table 344.30(B)(2)); otherwise 10 ft (344.30(B)(1)). Either way, the first support goes within 3 ft of each termination.

  • How far apart do EMT straps go?

    10 ft at most, and within 3 ft of every box, cabinet, conduit body or other termination (NEC 2023 358.30(A)). Where structural members don't readily permit fastening within 3 ft, an unbroken length may be fastened up to 5 ft from the termination.

  • What is the support spacing for PVC conduit?

    3 ft for trade sizes ½–1, rising by size to 8 ft for 6 (Table 352.30). PVC must also be fastened within 3 ft of each box or termination (352.30(A)). Conduit listed for other spacings may be installed to its listing.

  • How close to a box does flexible conduit need a strap?

    12 in for FMC and LFMC, then at intervals of no more than 4½ ft (348.30(A), 350.30(A)). LFNC is 3 ft apart and within 12 in on each side of every box (356.30). Each allows short unsupported lengths where flexibility is needed and up to 6 ft to a luminaire.

  • How far apart do ENT supports go?

    3 ft, and within 3 ft of each box or termination (NEC 2023 362.30(A)). Lengths up to 6 ft from a luminaire terminal connection, for tap connections to luminaires, needn't be secured.

  • How many straps does a conduit run need?

    12 straps for a 100 ft EMT run with one box along it, at the code minimum; with no box, 11 straps. In general: one strap within the end distance of each box or termination, plus enough between that no span exceeds the spacing. A box along the run ends the raceway on both sides, so each box-to-box segment is counted on its own.

  • Does this calculator save or send what I type?

    No. The calculator runs entirely in your browser. Nothing you enter is saved or sent anywhere, and no account is needed.

From the drawings to the bid

Count it, run it, price it.

TakeOn measures your devices and runs off the plans and turns them into a priced electrical bid. No credit card needed.